Building Egress Test #2

With both upper and lower keel tubes now part of the fuselage frame the full length of the fuselage is known.  Bolting it to the tail boom and empennage gives the full length of the aircraft which now allows us to determine if the assembly can be removed from the building.  The partially assembled aircraft also allowed for a photo op.

Bolting the fuselage frame to the fuselage boom.
Preparing the assembly for transport.
It's not looking so good as we enter the first turn in the stairwell.

Here we attempt to get the fuselage out of the building.  Although we were unsuccessful here we may still have a shot if we have more people available help with the lifting and negotiating.